Drilling Cost Per Foot Analyzer

Drilling Cost Per Foot Analyzer MCP Connector for Claude

A+

Calculate drilling cost per foot and perform sensitivity analysis for ROP and bit life.

4 tools Official Updated Oct 1, 2026 Official Vinkius Partner

This MCP server provides essential economic analysis tools for drilling operations. Use calculate_cpf to determine the primary cost per foot and total well cost based on rig rates, bit costs, and drilling/trip times. Perform sensitivity testing with analyze_rop_sensitivity to see how changes in the rate of penetration impact efficiency, or use analyze_bit_life_sensitivity to evaluate the impact of bit durability. You can also use estimate_formation_impact to adjust performance parameters based on rock hardness (soft, medium, or hard).

drillingoil-and-gascost-analysisengineeringeconomics

4 tools expose this connector's capabilities to your AI agent.

analyze_bit_life_sensitivity

Evaluates how the durability of the bit impacts the overall cost efficiency

analyze_rop_sensitivity

Evaluates how changes in drilling speed impact the overall cost efficiency

calculate_cpf

Determines the primary economic metric of the drilling operation

estimate_formation_impact

Provides a quick estimation of how different rock types affect drilling parameters

See how to talk to your AI agent using Drilling Cost Per Foot Analyzer.

Calculate the cost per foot for a 5000ft interval with a $500/hr rig rate, $5000 bit cost, 100 hours of drilling, and 20 hours of trip time.

The cost per foot for this interval is $12.00, with a total well cost of $60,000.

What happens to the cost per foot if my ROP increases by 15%? My current CPF is $12.00, ROP is 50 ft/hr, rig rate is $500/hr, bit cost is $5000, trip time is 20 hours, bit life is 500 ft, and total footage is 5000 ft.

An increase of 15% in ROP results in a new cost per foot of $10.85, which is a 9.58% reduction in cost.

Estimate the impact of moving from a medium to a hard formation if my base ROP is 50 ft/hr and bit life is 500 ft.

In a hard formation, the adjusted ROP is 25.0 ft/hr and the adjusted bit life is 250.0 ft.

Use the `calculate_cpf` tool by providing the rig rate, bit cost, drilling time, trip time, and total footage.

Related Connectors