Post-Frac Production Forecast

Post-Frac Production Forecast MCP Connector for Claude

A+

Predict well production lifecycles, flow regime transitions, and EUR following hydraulic fracturing.

4 tools Official Updated Oct 1, 2026 Official Vinkius Partner

This MCP server provides specialized reservoir engineering tools to forecast production after hydraulic fracturing. It allows AI agents to model the transition from transient flow to boundary-dominated flow and calculate critical metrics like initial production rates and Estimated Ultimate Recovery (EUR). Use calculate_initial_rate to determine peak production, predict_flow_regime_transition to identify when pressure transients hit reservoir boundaries, generate_decline_curve for time-specific rate predictions, and calculate_eur to estimate the total lifetime hydrocarbon recovery.

oil-and-gasreservoir-engineeringfracturingproduction-forecastingpetroleum

4 tools expose this connector's capabilities to your AI agent.

calculate_eur

Estimates the total lifetime production of the well

calculate_initial_rate

Determines the peak production rate immediately following the completion of the hydraulic fracturing process

generate_decline_curve

Provides the predicted production rate for a specific point in time based on the well's lifecycle

predict_flow_regime_transition

Predicts when a well will transition from transient flow to boundary-dominated flow

See how to talk to your AI agent using Post-Frac Production Forecast.

What is the estimated initial production rate for a reservoir with 50mD permeability, 100m fracture length, 10mD/ft conductivity, and 3000 psi pressure?

The initial production rate is 1,250 bbl/d.

When will the well transition to boundary-dominated flow with a fracture volume of 500,000 cubic feet, porosity of 0.15, and fluid viscosity of 0.5 cP?

The transition to boundary-dominated flow is predicted to occur at 450 days.

Calculate the EUR for a well with an IP of 1000 bbl/d, a decline exponent of 0.5, and an economic limit of 50 bbl/d.

The Estimated Ultimate Recovery (EUR) is 150,000 barrels with an estimated life span of 1,200 days.

The tool uses `predict_flow_regime_transition` to identify when a well moves from transient flow to boundary-dominated flow, allowing for accurate decline curve modeling.

Related Connectors