task-duration-total

task-duration-total MCP Connector for Claude

A+

Aggregates and analyzes task durations for workload insights.

4 tools Official Updated Oct 1, 2026 Official Vinkius Partner

This MCP server provides a specialized calculation engine for aggregating and analyzing time durations assigned to various tasks. It allows AI agents to calculate total time spent on specific task sets using get_total_duration, sum durations by category via get_category_duration, and retrieve detailed statistical insights like average and extreme durations through get_task_density_metrics. For a high-level overview of the entire system, use get_workload_summary to see total workload and task counts.

timedurationaggregationworkloadmetrics

4 tools expose this connector's capabilities to your AI agent.

get_category_duration

Sums the durations of all tasks belonging to a specific category

get_task_density_metrics

Provides analytical insights into how time is distributed across tasks

get_total_duration

Calculates the sum of durations for a specific subset of tasks

get_workload_summary

Returns a high-level overview of total time spent across all registered tasks

See how to talk to your AI agent using task-duration-total.

What is the total time spent on tasks T1, T2, and T3?

The total duration for tasks T1, T2, and T3 is 3600 seconds.

How much time has been spent on the 'development' category?

The total time spent in the development category is 15400 seconds.

Give me a summary of the total workload in the system.

The system currently has a total workload of 85000 seconds across 42 registered tasks.

You can use the `get_total_duration` tool by providing the list of task IDs you wish to sum.

Related Connectors