Reserves Reconciliation

Reserves Reconciliation MCP Connector for Claude

A+

Reconcile oil and gas reserve changes between reporting periods.

4 tools Official Updated Oct 1, 2026 Official Vinkius Partner

This MCP server provides specialized engineering and accounting tools to bridge the gap between opening and closing reserve volumes. It allows AI agents to calculate the reserve bridge using calculate_reserve_bridge, analyze the impact of technical versus commercial revisions with analyze_revision_impact, determine depletion efficiency via calculate_production_efficiency, and verify mathematical accuracy using validate_reconciliation_integrity.

oil-and-gasreservesreconciliationupstreampetroleum-engineering

4 tools expose this connector's capabilities to your AI agent.

analyze_revision_impact

Analyze the impact of technical vs commercial revisions

calculate_production_efficiency

Calculate production efficiency relative to total depletion

calculate_reserve_bridge

Calculate the reserve bridge between opening and closing volumes

validate_reconciliation_integrity

Validate the mathematical integrity of a reconciliation

See how to talk to your AI agent using Reserves Reconciliation.

Calculate the reserve bridge for an opening volume of 1000, production of 200, discoveries of 50, and technical revisions of -10.

The closing reserves are 840, with a total change of -160.

Analyze the impact of a 50 unit technical revision and a 20 unit commercial revision.

The primary driver is Technical, with a total impact of 70.

What is the production efficiency if production is 150, opening reserves were 1000, and other depletions are 50?

The production percentage is 75%.

A reserve bridge is a reconciliation that explains the movement from opening reserves to closing reserves by accounting for production, discoveries, revisions, and other factors.

Related Connectors