Long-Term Mine Plan Engine

Long-Term Mine Plan Engine MCP Connector for Claude

A+

Generates life-of-mine schedules and resource depletion profiles.

4 tools Official Updated Oct 1, 2026 Official Vinkius Partner

This MCP server provides specialized tools for mining engineering. It allows AI agents to validate resource integrity using analyze_resource_reserves, create extraction roadmaps with generate_production_schedule, track inventory via calculate_depletion_profile, and identify operational bottlenecks with evaluate_capacity_constraints.

miningresource-modelingproduction-schedulinggeologyoptimization

4 tools expose this connector's capabilities to your AI agent.

calculate_depletion_profile

Tracks the remaining inventory of resources over the planned duration

analyze_resource_reserves

Validates the integrity of the input data before planning begins

evaluate_capacity_constraints

Identifies bottlenecks where the mine plan exceeds physical limits

generate_production_schedule

Calculates the yearly movement of material based on constraints

See how to talk to your AI agent using Long-Term Mine Plan Engine.

Validate if my reserve statement is consistent with my resource model data.

The resource validation is successful. The total ore tonnage is 5,000,000 and the reserve-to-resource ratio is 0.85.

Generate a production schedule for a mine with 2,000,000 tons of ore and a 500,000 ton annual capacity.

The production schedule is complete. The mine will operate for 4 years, extracting 500,000 tons of ore annually.

Check for capacity bottlenecks in my current mine plan.

No bottlenecks were detected. The planned ore and waste tonnage remain within the specified capacity limits for all years.

You can use the `analyze_resource_reserves` tool to ensure your reserve statement is consistent with your resource model.

Related Connectors