Ground Support Selection

Ground Support Selection MCP Connector for Claude

A+

Specialized decision-support for geotechnical excavation stability.

4 tools Official Updated Oct 1, 2026 Official Vinkius Partner

This MCP server provides specialized geotechnical engineering tools to ensure excavation stability in mining and civil tunneling. It allows AI agents to calculate specific physical support components, assess safety margins, and determine corrosion mitigation strategies based on rock mass conditions, excavation span, and service life. Use calculate_support_requirements to determine bolt patterns and shotcrete thickness, evaluate_stability_safety_margin to check stability status, and get_corrosion_mitigation_strategy for long-term protection recommendations.

geotechnicalminingtunnelingexcavationstability

4 tools expose this connector's capabilities to your AI agent.

compare_support_options

Compares two different support configurations to aid in cost-benefit or safety-benefit analysis

evaluate_stability_safety_margin

Assesses how much additional load the selected support can handle before failure

get_corrosion_mitigation_strategy

Provides specific technical recommendations for protecting support elements based on the environment

calculate_support_requirements

Determines the specific physical support components needed for a given excavation scenario

See how to talk to your AI agent using Ground Support Selection.

What support is needed for a 5 meter span in poor rock mass with a 10 year service life?

For a 5 meter span in poor rock mass with a 10 year service life, the recommended support is Rock Bolts with a pattern of 1.2m spacing and 15cm of shotcrete.

Is my current support stable for a 12 meter span in fair rock?

The stability status for a 12 meter span in fair rock with the selected support is stable, with a safety factor of 1.65.

What corrosion protection should I use for a 50 year service life in a seismic zone?

For a 50 year service life in a seismic zone, the recommended mitigation method is epoxy_coated reinforcement with a maintenance interval of 24 months.

You can use the `calculate_support_requirements` tool, providing the rock mass condition, excavation span, and service life to receive the exact thickness required.

Related Connectors