FSRU Design Suite

FSRU Design Suite MCP Connector for Claude

A+

Design Floating Storage and Regasification Units (FSRU) based on import requirements and environmental conditions.

4 tools Official Updated Oct 1, 2026 Official Vinkius Partner

This MCP server provides a complete design methodology for sizing Floating Storage and Regasification Units (FSRU). It allows AI agents to calculate essential parameters including calculate_storage_capacity for LNG volume, calculate_regasification_capability for equipment rating, and design_mooring_system for structural stability. Users can also use evaluate_operational_profile to assess annual gas delivery reliability and risk based on weather and maintenance downtime.

fsrulngmaritime-designenergy-infrastructureregasification

4 tools expose this connector's capabilities to your AI agent.

calculate_regasification_capability

Determines the required regasification equipment rating to meet sendout demands

calculate_storage_capacity

Determines the required liquid LNG storage volume for the FSRU

design_mooring_system

Determines the appropriate mooring type and structural strength requirements

evaluate_operational_profile

Provides a summary of the FSRU's ability to meet annual gas demands

See how to talk to your AI agent using FSRU Design Suite.

Calculate the required LNG storage for a daily sendout of 500 units with deliveries every 14 days and a 3-day safety buffer.

The required storage volume is 8,500 units, with a safety reserve of 1,500 units.

What mooring type is needed for a site with 5 meter significant wave height and 25 knot wind speed?

A Turret Mooring system is required to maintain stability in these environmental conditions.

Determine the regasification equipment rating for a 400 unit sendout rate with 0.1 weather downtime and 0.05 maintenance downtime.

The required equipment rating is 470.59 units to ensure a 400 unit sendout rate is met given the 85% availability.

The `calculate_regasification_capability` tool uses a downtime fraction to ensure the equipment rating is high enough to meet target sendout rates during operational windows.